Skip to content
    • info@misotech.com.vn/en
    • 098 997 1723
Miso TechMiso Tech
  • Banner Logo2
  • Menu
  • Vietnam English
  • Home
  • About Us
    • About us
  • Product
    • Terminal accessories and insulators in substations
    • Connector accessories on transmission lines
    • Insulation
  • Blogs
  • Project
  • Document
  • Contact
  • Vietnam English
Home Project was implemented 500KV transmission line – Duyen Hai 3 . Thermal Power Plant

500KV transmission line – Duyen Hai 3 . Thermal Power Plant

ĐƯỜNG DÂY TRUYỀN TẢI 500KV – NHÀ MÁY NHIỆT ĐIỆN DUYÊN HẢI 3

  • Tên dự án: Đường dây truyền tải 500kV – Nhà máy Nhiệt điện Duyên Hải 3
  • Chủ đầu tư: Tổng Công Ty Truyền Tải Điện Quốc Gia (EVNNPT)
  • Nhà thầu: Công ty CP Tư vấn Thương mại và Công nghệ AMIC
  • Phạm vi cung cấp:

Duan Miso5

+) Phụ kiện kẹp đâu nối trên đường dây

+) Phụ kiện chống rung đường dây

  • Nhà sản xuất thiết bị chính: LORUNSER/Áo

Năm thực hiện: 2017

Related Post

  • Duan Miso6 220KV substation – Thai Binh Thermal Power Plant
  • Duan Miso4 500KV Pho Noi distribution station
  • Duan Miso1 Nghi Son 500KV substation
  • Duan Miso2 Distribution station 500KV, 220KV – Long Phu Power Center
  • Duan Miso3 500KV Distribution Station – Song Hau Thermal Power Center
  • Duan Miso7 500KV Pleiku 2 . substation
Product category
  • Insulation
  • Terminal accessories and insulators in substations
  • Connector accessories on transmission lines
Online support
HOTLINE
098 997 1723

info@misotech.com.vn/en

New product
  • Sanpham Miso1 Kẹp cực đơn/kép Contact
  • Sanpham Miso2 Ống nhôm Contact
  • Sanpham Miso3 Kẹp cực co giãn Contact
  • Sanpham Miso4 Khung định vị Contact
  • Sanpham Miso5 Chuỗi cách điện Contact
News
  • Official letter of the Prime Minister on ensuring electricity supply in 2022 and the following years Comments Off on Official letter of the Prime Minister on ensuring electricity supply in 2022 and the following years
  • Why are electricity customers increasingly satisfied with the services provided by EVN? Comments Off on Why are electricity customers increasingly satisfied with the services provided by EVN?
  • EVN General Director Tran Dinh Nhan worked with the Director of the World Bank in Vietnam Comments Off on EVN General Director Tran Dinh Nhan worked with the Director of the World Bank in Vietnam
  • Striving to reach 10,000 initiatives in the Vietnam Electricity Group Comments Off on Striving to reach 10,000 initiatives in the Vietnam Electricity Group
  • EVN’s hydropower reservoirs have discharged 4.24 billion cubic meters of water into this year’s winter-spring crop Comments Off on EVN’s hydropower reservoirs have discharged 4.24 billion cubic meters of water into this year’s winter-spring crop
Contact

MISO TECH Co., Ltd

  • Address: B3-12 Vinhomes Gardenia, Cau Dien Ward, Nam Tu Liem District, City. Hanoi
  • Trading office: B3-21 Vinhomes Gardenia, Cau Dien ward, Nam Tu Liem district, City. Hanoi
  • Hotline: 098 997 1723
  • info@misotech.com.vn/en
General introduction
  • About Us
  • Vision, mission
  • History begin
  • Contact Us
Supporting policies
  • Warranty Policy
  • Exchange, return and refund policy
  • Shipping Policy
  • Terms and forms of payment
  • Information Privacy Policy
Connect with us
  • Facebook
  • Youtube
  • Twitter
  • Wechat
  • Nhắn tin qua Zalo
  • Nhắn tin qua Facebook
  • 098 997 1723
  • Home
  • About Us
    • About us
  • Product
    • Terminal accessories and insulators in substations
    • Connector accessories on transmission lines
    • Insulation
  • Blogs
  • Project
  • Document
  • Contact

Login

Lost your password?